[废弃资源综合利用业] [2024-12-05]
我国移动源减污降碳进展与展望
[信息传输、软件和信息技术服务业,废弃资源综合利用业,计算机、通信和其他电子设备制造业] [2024-07-15]
[废弃资源综合利用业] [2024-07-11]
[废弃资源综合利用业] [2024-06-05]
The global smart waste management market is valued at USD 3.08 billion in 2024 and is expected to register a CAGR of 15.08%, reaching USD 6.21 billion by 2029. • Smart waste management directs the use of sensors in waste to observe the real-time status of municipal waste collection services and decide when bins should be emptied or filled. It also maintains track of past information collected by sensors and databases that can be utilized to pinpoint and enhance driver routes, fill patterns, and lower operating costs. Effective waste collection is more functional with remote monitoring and IoT-based waste bins.
[废弃资源综合利用业] [2024-06-03]
Liquid waste management requires filtration of waste, unlike waste segregation in solid waste management. Generally, liquid waste is generated when water is used once and is no longer fit for human consumption or any other activity. Various manufacturing activities in industries generate wastewater, which is sometimes difficult to treat due to various toxic chemicals in the wastewater. A proper liquid waste management facility includes all phases of the process, namely liquid collection, storage, transportation, disposal, and waste treatment. Neglecting any aspect of liquid waste management in treating industrial wastewater generated after production activity can lead to contaminated water runoff.
[废弃资源综合利用业] [2024-05-16]
[计算机、通信和其他电子设备制造业,废弃资源综合利用业] [2024-05-11]
[仪器仪表制造业,电力、热力、燃气及水生产和供应业,电气机械和器材制造业,废弃资源综合利用业] [2024-03-29]
The rise in the aging wind farms and regulations supporting wind decommissioning services are likely to boost the global wind turbine decommissioning services market during the forecast period. During the course of the wind project, the wind turbine components may be retrofitted with upgraded ones to extend the lifetime of the project. However, when the wind turbines reach the end of their useful lives, the components and the wind farm need to be decommissioned. Wind turbine decommissioning consists of a series of steps to close a wind power plant facility at the end of its lifetime. The major processes involved in wind turbine decommissioning include dismantling, waste transportation, and site treatment and reuse.
[科学研究和技术服务业,废弃资源综合利用业] [2024-02-22]
[废弃资源综合利用业] [2024-02-20]