欢迎访问行业研究报告数据库

行业分类

当前位置:首页 > 报告详细信息

找到报告 1 篇 当前为第 1 页 共 1

在德卢斯的阿特拉斯工业园区经济和太阳能光伏性能的可行性研究,明尼苏达。研究制备与环境保护局的合作改造美国的土地选址可再生性倡议

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Atlas Industrial Park in Duluth, Minnesota. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewab

 

作者:Steen, M.Lisell, L.Mosey, G. 作者单位:National Renewable Energy Lab., Golden, CO.;Department of Energy, Washington, DC. 加工时间:2014-08-04 信息来源:科技报告(DE) 索取原文[53 页]
关键词:太阳能;光伏性能;可行性;环境保护
摘 要:The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site. The feasibility of a PV project depends greatly on both site-specific and economic factors. Site-specific factors include the available area for an array, solar resource, distance to transmission lines, and distance to major roads. In addition, the operating status, ground conditions, and restrictions associated with redevelopment of contaminated sites impact the feasibility of a PV system. Economic factors include purchase price of the electricity produced, power purchase agreement (PPA) price, and retail electric rates along with federal, state, and utility incentives for PV systems. The Atlas Industrial Park is a 62-acre brownfield site currently undergoing remediation and redevelopment. The Duluth Economic Development Authority (DEDA), which owns the property, is considering a 2-acre parcel for a PV installation as part of its redevelopment plan. Based on an assessment of the site conditions, the Atlas Industrial Park is suitable for deployment of a large-or small-scale PV system; however, the economics specific to the area currently limit the financial viability of a PV installation. Table ES-1 summarizes the performance and economics of the different PV systems and the development/financing options evaluated in this study. The table shows the annual energy output, the levelized cost of energy (LCOE), and the PPA price along with the payback period and cost of each system.
© 2016 武汉世讯达文化传播有限责任公司 版权所有
客服中心

QQ咨询


点击这里给我发消息 客服员


电话咨询


027-87841330


微信公众号




展开客服