欢迎访问行业研究报告数据库

行业分类

当前位置:首页 > 报告详细信息

找到报告 1 篇 当前为第 1 页 共 1

Viryd CS8风力发电机的持续时间测试报告

Duration Test Report for the Viryd CS8 Wind Turbine
作者:Roadman, J.Murphy, M.van Dam, J. 加工时间:2014-07-18 信息来源:科技报告(DE) 索取原文[54 页]
关键词:风能;风力发电机;声学测试;电力系统
摘 要:This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Several turbines were selected for testing at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of the Small Wind Turbine Independent Testing project. Duration testing is one of up to five tests that may be performed on the turbines. Other tests include safety and function, power performance, acoustic noise, and power quality. Viryd Technologies, Inc. of Austin, Texas, was the recipient of the DOE grant and provided the turbine for testing.
© 2016 武汉世讯达文化传播有限责任公司 版权所有
客服中心

QQ咨询


点击这里给我发消息 客服员


电话咨询


027-87841330


微信公众号




展开客服