F-35联合攻击战斗机:速度比在软件测试预期进度低可能会限制初始作战能力

F-35 Joint Strike Fighter: Slower Than Expected Progress in Software Testing May Limit Initial Warfighting Capabilities

作者:M. J. Sullivan 加工时间:2015-07-11 信息来源:科技报告(AD) 索取原文[12 页]
关键词:传感器;作战效能;计算机程序
摘 要:Thank you for the opportunity to discuss our work on the F-35 Lightning II, also known as the Joint Strike Fighter (JSF). With estimated acquisition costs approaching $400 billion, the F-35 is the Department of Defense s (DOD) most costly and ambitious acquisition program. The program is developing and fielding a family of next generation fighter aircraft, incorporating low observable (stealth) technologies as well as advanced sensors and computer networking capabilities for the United States Air Force, Navy, and Marine Corps as well as eight international partners.1 As we have reported in the past, DOD began the F-35 acquisition program in October 2001 without adequate knowledge about the aircraft s critical technologies or its design. The F-35 family is comprised of three aircraft variants: (1) a conventional takeoff and landing (CTOL) variant, (2) a short takeoff and vertical landing (STOVL) variant, and (3) a carrier-suitable variant (CV). The F-35 is integral to U.S. and partner plans to replace existing fighter aircraft and support future combat operations. According to current plans, the U.S. portion of the program will require annual acquisition funding of more than $12 billion on average through 2037 to complete development and procure a total of 2,457 aircraft. In addition, the F-35 fleet is estimated to cost around $1 trillion to operate and support over its lifetime. In a time of austere federal budgets, cost projections of this magnitude pose significant fiscal challenges.
© 2016 武汉世讯达文化传播有限责任公司 版权所有 技术支持:武汉中网维优
客服中心

QQ咨询


点击这里给我发消息 客服员


电话咨询


027-87841330


微信公众号




展开客服