欢迎访问行业研究报告数据库

行业分类

当前位置:首页 > 报告详细信息

找到报告 1 篇 当前为第 1 页 共 1

办公楼地源热泵应用的初步筛查工具研究

Development of a Preliminary Screening Tool for Ground Source Heat Pump Applications in Office Buildings

作者:Liu, X.; Adams, M.; Shonder, J. 作者单位:Oak Ridge National Lab., TN.; Department of Energy, Washington, DC. 加工时间:2015-07-15 信息来源:科技报告(DE) 索取原文[8 页]
关键词:节能;地源热泵;办公楼;筛查;电脑仿真
摘 要:The current practice for evaluating the payback period for a GSHP application can be time consuming and expensive owing to the large number of inputs required by simulations and the complexity of the simulations. It is highly desirable to have a tool that can estimate the payback period with reasonable accuracy but minimal expenditure of both time and money. An approach to simplifying the evaluation effort is to identify the key parameters that most significantly affect the payback period of GSHP applications. Through a comprehensive parametric study, key parameters are identified that, within a typical range of variations, can make more than a 30% difference in the payback period for implementing a typical GSHP system in typical medium-size office buildings.
© 2016 武汉世讯达文化传播有限责任公司 版权所有 技术支持:武汉中网维优
客服中心

QQ咨询


点击这里给我发消息 客服员


电话咨询


027-87841330


微信公众号




展开客服