-
全球材料测试设备市场报告(2014-2018年)
Material testing equipment is used for finding out the physical properties of materials, such as fatigue, hardness, bending, stress, and impact analysis. Material testing equipment is generally used for destructive type of testing, which finds out the physical properties of materials before their intended usage. Testing of these materials is required to determine the type of material to be used for manufacturing a particular product. Material testing equipment helps in reducing the risk of material failure in manufacturing as it helps in determining the fitness of use of a particular material.
-
全球自动化物料搬运设备市场报告(2014-2018年)
Automated material handling is the automation that eliminates the need for manual labor to sort, organize, retrieve, and move materials from one place to another.
-
全球航天军工辅助动力装置市场报告(2014-2018年)
An APU is used to provide ground power, hydraulics, air conditioning, and air to start the engines when an aircraft is on the ground. Most APUs use centrifugal compressors. They work by spinning an impeller, which throws the air outward through a convergent duct with diffuser veins to direct the compressed gas on to the combustion chamber.
-
全球卫生泵市场报告(2014-2018年)
Sanitary pumps (also known as hygienic pumps) are employed in the manufacturing line to initiate the flow of sensitive media vulnerable to contamination. The nature of these media may vary from liquids of low viscosity to semi-solid consumable products. Contamination threat is very high while handling the flow of these media because of a higher probability of exposure to microbial activities.
-
全球核动力蒸汽发生器市场报告(2014-2018年)
Nuclear SGs are used to transfer the heat generated from the primary loop to the secondary loop. Piping systems, which have very high pressure and temperature, contain coolants and are called primary loops. A secondary loop consists of a separate piping system where water is converted into steam to rotate the turbines. The water that goes through the primary loop never mixes with the water from the secondary loop. The SG is linked between the primary loop and the secondary loop to generate electricity from the NPP.